Offshore
The North Sea Storm
When Mother Nature Took Charge

Growing up in Coco Solo in the Panama Canal Zone, I saw some pretty powerful Atlantic storms. But nothing I saw growing up prepared me for what I would eventually experience working offshore in the North Sea.
I was working on Chevron's Ninian South oil platform, and we were living aboard a semi-submersible accommodation barge. Now, these things were pretty remarkable. They had enormous pontoons that were submerged well below the surface, which made them much more stable than an ordinary ship. Under normal conditions, you could be sitting in the galley eating dinner and hardly know you were floating in the middle of the North Sea. But that only worked up to a point.
The wind was ferocious. I remember standing in the radio room aboard the semi-submersible, watching the anemometer remain pegged at the top of its scale. I remember the winds being estimated at 120 knots, nearly 140 miles per hour. Whatever the actual wind speed, it was the worst storm I experienced in all my years offshore.
The waves were running about fifty-five feet high. That's not a guess. One of the big legs had meter marks painted on it, and from peak to trough the seas were hitting sixteen to seventeen meters, the highest any of us had ever seen. Think about that for a minute. That's roughly the height of a five-story building, and these damn things were coming at us one after another. Even our semi-submersible couldn't sit still in that kind of weather. The whole barge would slowly rise about three feet, move sideways another three feet, settle back down, and then start the whole cycle over again. It wasn't rocking and rolling like an ordinary ship. It was more like somebody had picked up the entire barge and was slowly moving it around. And it went on for hours.
A lot of the construction workers had never experienced anything remotely like this. Many of them put on their life jackets and gathered in the interior passageways. Some were sitting quietly, some were praying, and I imagine quite a few were wondering what in the hell they'd gotten themselves into. Nobody could go outside because the wind would have blown them right off the walkways.
I was Chevron's senior representative aboard, so I decided to go up to the bridge and see what was going on. There were six very serious-looking fellows up there, all busy with their jobs. I wasn't about to tell the skipper how to operate his barge. I just wanted to know how much trouble we were in.
The bridge had twelve television monitors showing the anchor winches. Normally, the barge was held in position by anchors running out in different directions. But the storm had turned us around, and by then only two anchors were still holding us, one at the bow and the other off the starboard bow. The rest had been released and marked with buoys so they could be recovered after the storm.
I stood there watching the monitors. The tension on the anchor cables would slowly climb toward 120 tons. Then the winch operator would release the brake and let out some more cable until the tension dropped back to around 60 or 80 tons. He'd lock the brake again, and the whole damn process would start over. Now, these weren't little ropes. They were two-inch steel cables with a breaking strength of about 160 tons. So when the tension was getting up around 120 tons, we were getting pretty damn close to the limit.
After watching this for a while, I turned to the skipper.
"How much wire is left?"
"The bow anchor started with twelve thousand feet. We've got about thirty-two hundred left."
"What about the other one?"
"Started with eight thousand. We've got about eleven hundred left."
I looked back at the monitor. Every time the tension climbed, the winch operator let out a little more cable, and there was less and less of it left on the drum.
"How long before we run out?"
"About two hours."
Well, shit. That wasn't exactly encouraging.
There was a young meteorologist aboard, so I walked over to him.
"When's this damn storm going to let up?"
He looked at his instruments and told me the wind had already started coming down. It was still blowing over 100 knots, but he figured it would drop below ninety within another hour. That was the first bit of good news I'd heard.
I went back over to the skipper. "What happens if we run out of cable?"
He explained that the supply boats couldn't possibly get close enough to take a line aboard in that weather, and nobody could go outside to do anything anyway. Then he looked out through the bridge windows. Twenty miles or so to the north, you could just barely make out the lights of Shell's Brent field, but you could sure see their flare. He pointed toward it.
"We'll call Shell over there and tell them we're drifting their way."
And he said it just as calmly as if he were telling somebody what was for dinner.
I looked out at that flare, then back at the anchor winches. Here we were, sitting on a floating accommodation barge with hundreds of men aboard, fifty-five-foot seas, winds strong enough to peg the anemometer, and only two anchor cables keeping us from drifting across the North Sea. And we were running out of cable.
There wasn't a damn thing I could do about it. The skipper and his crew knew their jobs, and they were doing everything they could. All I could do was stand there and watch. So that's what I did. I stayed on the bridge, watching those winches and the weather instruments, hoping the wind would die down before the last of the cable disappeared.
Fortunately, the storm finally started letting up. The wind came down, the tension on the anchors eased, and the winch operators were finally able to stop paying out cable. When everything settled down, there were only about three hundred feet of wire left on the starboard anchor drum. We'd started with eight thousand feet on that anchor, and the storm had taken damn near all of it.
I've been through hurricanes, tropical storms, and some pretty miserable weather during my years working offshore, but I've never forgotten that day in the North Sea. People sometimes ask me what it was like building those enormous offshore oil platforms. Most of the time it was interesting work with some of the best people I've ever known. We had giant cranes, thousands of tons of steel, and engineering that was pretty remarkable for its time.
But every once in a while, Mother Nature would remind us that she didn't give a damn how much engineering went into those platforms.
We might have built the damn things, but the North Sea was still in charge.